ADTRAN SLC-5 U-BR1TE III User Manual Page 33

  • Download
  • Add to my manuals
  • Print
  • Page
    / 136
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 32
Chapter 2. Installation
61202052L1-1 TSU 100 User Manual
2-9
Normal Power-Up Procedure
After the unit has been put into operation with the initial
power-up and initialization, the subsequent power-up proce-
dures include only the power-up self-test followed by the
request for a passcode (password) if this option was selected
during initialization.
Use the
Number Keys
to enter the previously recorded pass-
code, and then press
Enter
.
Page view 32
1 2 ... 28 29 30 31 32 33 34 35 36 37 38 ... 135 136

Comments to this Manuals

No comments