Total Access 3000/3010 T1-OR/NIU Installation and Maintenance Practice
6 61181310L2-5D
FRONT PANEL OPERATION
The T1-OR/NIU provides the following front panel operational controls:
•
LBK pushbutton
XMT and RCV span power test points
•
DSX TX and RX monitor (MON) jacks
•
DSX TX and RX equalizer (EQ) jacks
LBK Pushbutton
The LBK push button initiates a loopback to the network and sends an AIS signal (all ones)
toward the customer end.
LBK Operation
•To activate a loopback, depress the
LBK pushbutton for two seconds. If successful, the TST
LED illuminates. Release the pushbutton.
•To release a loopback, depress the
LBK pushbutton a second time.
XMT and RCV Span Power Test Points
The test points provide front-panel access for measuring the 60 mA-current provided to the
DS1 facility when the T1-OR module is in the T1-OR mode.
Test Point Operation
Table 3 provides the VOM connections for both span current and voltage measurements.
Table 3. Span Current/Voltage Test Points
When Measured
Between Points
Measurement Taken
+TX to –TX Measures the transmit span current
A reading of 0.6 volts indicates a 60 mA span current in the transmit path
+RX to –RX Measures the receive span current
A reading of 0.6 volts indicates a 60 mA span current in the receive path
–TX to +RX Measures the actual span voltage being supplied to the facility.
This is the span voltage across the facility T/R pairs
Comments to this Manuals